Manager Project   Project Title   Estimated Budget Project Phase
CRAIG PETERSON
  M2446   5TH & KIRKHAM CHILD CARE CENTER   $6,724,000.00 Construction
  M7446   KIRKHAM CHILDCARE PLAY YARD EXTENSION   $300,000.00 Construction
  M8454   1482 5TH AVENUE HOUSING REMODEL   $167,000.00 Warranty
DAN KRASNOW
  M3444C   IRM 600 T CHILLER   $3,000,000.00 Construction
  M6424   HSE HIGH VOLTAGE SWITCHGEAR REPLACEMENT   $3,227,435.00 Construction
  M7410A   PARNASSUS INFRASTRUCTURE - CONDENSATE RETURN SYSTEM BYPASS RENEWAL   $1,237,774.00 Warranty
  M7410B   MSB CHILLER LOOP BYPASS PIPING RENEWAL   $552,176.00 Warranty
  M7410C   HSIR INDUSTRIAL HOT WATER SYSTEM RENEWAL   $422,377.00 Warranty
  M7410D   MU H-LEVEL DETERIORATED WATER PIPING REPLACEMENT   $278,530.00 Owner Move-In
  M7410E   MSB MACHINE ROOM S186 SEWER PIPING REPLACEMENT & CONTAINMENT WALL RENEWAL   $400,000.00 Warranty
  M7450   ALDEA SAN MIGUEL COMMUNITY CENTER   $1,600,000.00 Construction Documents
  M8405   PCUP AQUEOUS-AMMONIA CARRIER PIPE RENEWAL   $796,382.00 Warranty
  M8435   SON HEAT EXCHANGE & PUMP REPLACEMENT   $60,000.00 Design/Engineer Selection
  M8439   INSTITUTE FOR REGENERATION MEDICINE BUILDING ANCILLARY SITEWORK   $4,544,000.00 Construction
  M8450   PARNASSUS STAIRWELL LIGHT FIXTURE REPLACEMENT   $117,485.00 Construction
  M8450A   MSB STAIRWELL LIGHT FIXTURE REPLACEMENT   $123,383.00 Construction
  M8450B   HSIR-WEST STAIRWELL LIGHT FIXTURE REPLACEMENT   $123,383.00 Construction
  M8450C   HSIR EAST STAIRWELL LIGHT FIXTURE REPLACEMENT   $123,383.00 Construction
  M8450D   SON STAIRWELL LIGHT FIXTURE REPLACEMENT   $123,383.00 Construction
  M8457   MSB S16 THRU S24 EMERGENCY RELOCATION AND FACILITY RESTORATION   $50,000.00 Construction
  M9425   PARNASSUS INFRASTRUCTURE UTILITY METER REPLACEMENTS   $1,500,000.00 Design/Engineer Selection
  M9426   PARNASSUS INFRASTRUCTURE AIR COMPRESSOR REPLACEMENT & PUMP MOTOR VFD'S   $1,000,000.00 Design/Engineer Selection
  M9427   MSB LARC DOOR & FRAME REPLACEMENTS   $700,000.00 Design/Engineer Selection
  M9428   HSIR FAN & DAMPER REPLACEMENTS   $725,000.00 Design/Engineer Selection
  M9429   MSB/CSB/HSIR FIRE DOOR REPLACEMENTS   $1,000,000.00 Design/Engineer Selection
  M9430   KORET VISION RESEARCH ENERGY MANAGEMENT CENTER SYSTEM RENEWAL   $600,000.00 Design/Engineer Selection
  M9432   KORET VISION RESEARCH FIRE ALARM PANEL AND CPU REPLACEMENT   $140,000.00 Design/Engineer Selection
  M9433   MSB BASEMENT FIRE SPRINKLER VALVE REPLACEMENT   $20,000.00 Design/Engineer Selection
DENISE STRIPLING
  M6418   PARNASSUS UTILITIES MASTER PLAN   $2,436,000.00 Ad/Bid
  M8434   PCUP MODICON CONTROL SYSTEM REPLACEMENT   $390,000.00 OSHPD
DON SZETO
  M7451   LUCIA CHILD CARE CENTER RENOVATION   $885,000.00 Construction Documents
  M9401   ACC/MU GARAGE AND ACC TOWER CONCRETE SPALLS ASSESSMENT   $112,000.00 Programming
EILEEN JUE
  M8409   MILLBERRY UNION I LEVEL RM 005 REMODEL   $50,000.00 Design/Engineer Selection
  M9417   HSE 5TH FLOOR RM 503/595 LAB TO OFFICE RENOVATION   $190,000.00 Design/Engineer Selection
FRANK FASANO
  M7412A   HSIR FIRE ALARM SYSTEM RENEWAL   $350,000.00 Construction Documents
  M7412B   MSB FIRE ALARM SYSTEM RENEWAL   $250,000.00 Construction Documents
  M9420   SCHOOL OF NURSING-FIRE ALARM REPLACEMENT   $228,000.00 Design/Engineer Selection
  M9421   SCHOOL OF DENTISTRY-FIRE ALARM REPLACEMENT   $404,000.00 Design/Engineer Selection
  M9422   PCUP-FIRE ALARM REPLACEMENT   $120,000.00 Design/Engineer Selection
  M9423   CLINICAL SCIENCES-FIRE ALARM REPLACEMENT   $288,000.00 Design/Engineer Selection
  M9424   KORET FIRE ALARM REPLACEMENT   $140,000.00 Design/Engineer Selection
GARY NELSON
  M8417   HSIR SEISMIC STUDY   $500,000.00 Programming
JULIE GALLIVAN
  M3444D   IRM OEH&S AND TRAILHEAD ACCESS STAIRS   $150,000.00 Design/Engineer Selection
  M7411A   HSIR UTILITY TUNNEL MOTOR CONTROL CENTER EMERGENCY ELECTR PANEL REPLACEMENT   $128,000.00 Construction
  M7411B   CSB 7TH FLOOR ELECTRICAL PANEL "B" AND FRP ROOFTOP PANEL REPLACEMENT   $305,000.00 Construction
  M7434   ALDEA STUDENT HOUSING REHABILITATION   $5,100,000.00 Construction
  M7489   PARNASSUS CENTRAL RECEIVING AREA SECURITY GATE   $80,000.00 Construction Documents
  M8411   SOD LOBBY AREA REDESIGN   $870,766.00 Construction Documents
LUANNE MULLIN
  M5470   HSW 14TH FLOOR DEPT OF OB/GYN LAB RENOVATION   $4,985,068.00 Owner Move-In
  M6409   HSW 7TH FLOOR NEUROLOGICAL SURGERY LAB RENOVATION   $794,062.00 Ad/Bid
  M6428   MSB 13TH FLR, S1372 ANATOMY DEPT RENOVATION   $7,500,000.00 Design Development
  M6462   MSB 11TH FLR S/M ORTHO SURGERY LAB/OFFICE RENOVATION   $4,435,078.00 Construction Documents
  M6464   MSB 5TH FLOOR S/M LAB MED RENOVATION   $2,000,000.00 Construction
  M7415   DEFERRED MAINT 06-07, BP 6 - KALMANOVITZ LIBRARY ELEVATOR CONTROLS RENEWAL   $1,000,000.00 Construction
  M7424   HSE 4TH FLOOR ROOMS 447-448 S/M REMODEL   $434,181.00 Warranty
MIKE TOPORKOFF
  M3444   INSTITUTE FOR REGENERATION MEDICINE BUILDING   $123,256,000.00 Construction Documents
  M3444A   IRM GROUP 2 & 3 EQUIPMENT, FURNITURE AND RELOCATION   $3,810,000.00 Schematics
  M7404   CSB SEISMIC INTERIM MITIGATION STUDY, PHASE 1 - CONCEPTUAL DESIGN/ESTIMATE   $100,000.00 Programming
PATRICK MCGEE
  M7401   HSE 15 S/D CRANIOFACIAL & MESENCHYMAL BIOLOGY PROGRAM LAB RENOVATION   $6,992,239.00 Construction
  M7464   SOD D4203 DENTAL LAB RENOVATION   $633,138.00 Owner Move-In
PATTI MITCHELL
  M5417   HSE 5 CENTER FOR BIOENGINEERING AND TISSUE REGENERATION   $3,934,653.00 Contract Award
  M7402   TELEMEDICINE AND PRIME-US EDUCATION FACILITIES   $35,000,000.00 Ad/Bid
  M8402   CORRIDOR REPAIR PROJECTS   $1,000,000.00 Ad/Bid
  M8402A   MSB CORRIDOR REPAIR PROJECT   $200,000.00 Ad/Bid
  M8402B   CSB CORRIDOR REPAIR PROJECT   $200,000.00 Ad/Bid
  M8402C   HSIR BUILDINGS ELEVATOR LOBBY AREA REPAIR PROJECT   $200,000.00 Ad/Bid
  M8404   MUW 200 SAA REMODEL AND STAFF RELOCATION   $1,179,424.00 Final Documents
  M8425   MSB 564 CONVERT LAB TO OFFICE SPACES   $535,290.00 Ad/Bid
  M9409   CAMPUS LIBRARY 24 HOUR ACCESS RESTROOMS   $10,520.00 Programming
  M9412   LIBRARY MU WEST EXTERIOR HANDRAIL SAFETY IMPROVEMENTS   $35,000.00 Design/Engineer Selection
SUSAN SIMPSON
  M2444   MSB IMPROVEMENTS PHASE 2   $35,355,000.00 Construction
  M7445   MSB IMPROVEMENTS PHASE 3   $26,200,000.00 Programming